Premium products, design & support — end-to-end
We don't just install panels. We design the whole experience — so you don't have to manage crews, paperwork, utilities, or surprises.

In-house teams. Never subcontracted.
Four things that set ION apart
Tier-1 equipment only
Monocrystalline panels, smart inverters, and optional battery storage from top-rated manufacturers with 25-year warranties.
Custom system design
Every home is measured, modeled, and designed for its specific roof geometry, shading, and energy profile — not a template.
Done-for-you service
Financing, design, permits, utility paperwork, inspection, activation — we handle the entire chain. You sign, we execute.
Support after install
A dedicated support line, monitoring app, and ongoing performance checks that outlast your warranty.
Modern aesthetics
All-black panels, hidden mounting, clean cable runs. Panels that look like they belong on your roof — not bolted to it.
Transparent pricing
One quote. No bait-and-switch. We walk you through every line so you know exactly what you're paying for.
From first call to first kilowatt
A typical ION install takes 6–10 weeks from signing to activation. Most of that is utility paperwork — we do the heavy lifting while you go about your life.
- Week 1: Consultation, site survey, custom system design
- Week 2–3: Financing finalization and permit submission
- Week 4–6: Installation (1–3 days on-site)
- Week 7–10: Utility inspection and system activation